Subscribe to my you tube channel for 280+ coal mine tributes and counting.On 15th August 1997 a new coal face at Asfordby colliery near Melton Mowbray in North West Leicestershire experienced severe heavy weighting and water began pouring in from the overlying water-bearing strata. The face soon became flooded and it was impossible to pump it clear, and the ventilation was cut off. The conditions at the pit were assessed and in the light of what was found, a decision was made to close the colliery on 18th August 1997 after only 2 years of production.
The new Asfordby mine was sunk by British Coal 1986-1987, and opened in April 1995, after 11 years of preparation. The proposed site was chosen in 1982 and preparation work continued to 1984.The 490 miners had produced only 1.5 million tonnes of saleable coal in that time,cost of the project was around £350m - £400m. It had been planned as a super-pit to produce up to 4 million tonnes a year, when in full production. However the project seemed doomed from the start. It had been sunk near to Melton Mowbray in Leicestershire, to the extreme end of the Vale of Belvoir, in the centre of which lies the best coal.The two other sites proposed for mines were at Hose and Saltby, but planning permission for these had been refused, following a public inquiry. Also to distance it from the Belvoir Castle connection.The two other sites proposed for mines were at Hose and Saltby, but planning permission for these had been refused, following a public inquiry.
It was known that there was a ‘white wall’, where the layers of volcanic rock converged into one solid mass between Asfordby and the rich seams in the Vale of Belvoir, but that would have meant driving at least two tunnels over 2 miles long through this hard rock structure and of course as privatisation appeared, the public money disappeared, and RJB Mining would have to find the money for the development.Looking at the plan one immediately notes that to sink a mine in that position right on the edge of the Coalfield was ludicrous. It was known that there could be problems of water-bearing strata above the seams and the area to be worked from that location would be small in comparison to the position of the proposed Hose mine where workings could extend in all directions from the shafts. To save face the project had to go ahead even though the initial plans were scotched.Around 80 boreholes had been drilled throughout the area to prove the possible number of seams to work before any thought had gone into the scheme in my opinion. The Duke of Rutland at Belvoir Castle was not going to allow mining ‘in my back yard’. He had more influence than the Coal Board.There was a petition of 30,000 signatures against the scheme plus further opposition from 30 Parish Councils. There was no major road or rail to the favoured central site. Town and Country Planning had to be sought for underground working (as applied to all new mines after 1948) as well as surface works. How could the coal be transported from the Vale?In October 1979 a public enquiry was held to consider whether mining should be allowed. It was not until 1982 that the NCB were informed that a new submission must be made. In 1983 the Secretary of State for the Environment finally agreed that one site could proceed. There was an old disused rail connection near to the site that could be used.Work in preparation for construction of the new £400m colliery at Asfordby started October 1984. The initial exploration had begun in Nov 1973. It was decided to construct freezing chambers at 300 yards (275m) below ground level to allow sinking to proceed through the water-bearing measures.Planned shaft sinking was 141 weeks. The UC shaft, surface level 293.3 feet (+89.4m), drilling was started 21st Aug 1985, and finished by 22nd January 1986 (22 weeks). The DC shaft, surface level 295 feet (+89.9m) also had 4 drills and started 11th Dec 1985 and finished 16th Apr 1986 at 563 yards (515m), winding level at 480m. The freeze holes had to be drilled to great accuracy and 39 were drilled by British Drilling and Freezing Ltd to give an ice wall of about 5 feet (1.5m). The project was renamed South East Nottinghamshire when looked at as a possible extension from Cotgrave. Originally it was a colliery in Central Area. Finally it was brought under the administration of the Nottinghamshire Group with HQ at Edwinstowe. Note the large turnover of management in such a short time. Nobody seemed to stay there long. Not good for continuity for a new mine. There would be too many ideas and changes, human nature dictates it. Although hundreds of metres of roadways were driven, some at phenomenal rates the infrastructure still did not ring true to me and I had surmised rightly that the enterprise would fail, but of course at the time of sinking and initial driving, it was public money!
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: