WNS POMORZE PIPE SPOOLS FABRICATION & INSTALLATION
Автор: WNS Pomorze
Загружено: Дата премьеры: 25 нояб. 2020 г.
Просмотров: 558 просмотров
Location
Our main Workshop: is situated in Gdańsk Poland in the former Shipyard of Gdańsk
Our Main workshop dimensions are:
25 x 55 m Height 5,69 m (to crane 3,81 m)
Second floor 25x55 m (to crane 2,39 m)
Secondary Workshop with offices and welding school – situated in Gdańsk Twarda 12A street - 1 600 m2 (3 km from the main workshop)
Info about logistics for possible transportation of prefabricated items to Poland (e.g. info about road accessibility to the shop and relevant transportation limitations, distance from shop to the nearest commercial port, etc).
The nearest port is Port of Gdańsk situated 5 km from our location
Second port is Port of Gdynia situated 25 km from our location
There is also berth with cranes in shipyard (500 m from our location which could be used for load a ship)
Our workshop is also situated very close to main road connection in northern Poland with very good access to many logistic transport Companies
List of available machines/equipment including cranes with their capacity
65 TIG welding machines
Band saws dia. To 450 mm
30 working tables
25 welding stations and secure screens
traveling cranes 3,2 T, 2,1 T, 1,6 T,
outside traveling crane 5 T
basic equipment for 120 workers
NDT equipment (VT, MT, RT, PMI)
High pressure cleaning machines
Weld Passivation equipment
2 forklifts 2,1 T & 3,2 T
Sandblasting chamber 5x12 m
Very close to our workskop subcontractors:
Laser/plasma/water jet cutting
Bending and machining works
Painting and Hot Deep Galvanizing
Pickling and passivation
Capacity of the shops: max and/or average production capacity (steel tons/month, piping DI/month)
Our capacity:
10-40 tons/month
Piping 15000 DI/month

Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: