How To Use Resource Leveling In Primavera P6 Professional || Primavera Tricks || dptutorials
Автор: dptutorials
Загружено: 10 апр. 2020 г.
Просмотров: 27 483 просмотра
In this tutorial, let us see How To Use Resource Leveling In Primavera P6 Professional
Whenever you are running short of any resource in your organization, you can solve the problem of overloading issue by using the resource leveler function in oracle primavera p6 professional.
You know you can reduce or eliminate overloads of resources within or across projects. This can be done based on priorities that you define at the project level or activity level.
This tool is the best one for capacity planning and also to analyse the impact of resource over allocations.
Now, let us see how to use this feature.
First let us see how we can set priorities at project level.
In the Projects view of P6 Professional, right click here and go to columns and select customize.
In the general tab, click on Project Leveling Priority and add it to columns.
This allows you to set a number against a project that indicates its priority for respective project. The lower the number, the higher the priority.
Now let us open this schedule and let us set activity level priorities.
Similarly, right click, click on columns and go to general tab and select Activity leveling priority to add to the visible columns.
Here, The priorities range from Top to Lowest and can be set against activities within the schedule which will guide the leveler whether to move activities, or not.
Once you are done with the setting up of priorities, Click on Resource leveler from the menu bar.
This will run the Level Resources dialog. Here, you can define parameters as per your need.
In the bottom portion of level ling priorities, we are going to level our project using both its project and activity leveling priorities.
Click on Add button, to add each of the required leveling priority fields into the table area and then determine an ascending or descending sort order for each one.
Once you are done with the selection of required options for leveling, click the Level button to start the process.
You will notice that P6 Professional will move activities in order to eliminate or at least reduce the resource overload issue.
In order to maintain the new dates for the schedule going forward, you have to make some more changes.
Go to resource leveler and select the option “Automatically level resources when scheduling” and close this window.
Go to Schedule options and tick the checkbox, “Level resources during scheduling”.
So, this is the best way to use the Resource leveling priorities in primavera p6.
Got it friends?
If you have enjoyed this tutorial, please give me a like, share and comment.
For further more interesting videos, please do subscribe dptutorials
For Personalized detail learning, write to [email protected]
If you found this video valuable, give it a like. If you know someone who needs to see it, share it. Leave a comment below with your thoughts. Add it to a playlist if you want to watch it later.
***********************************************
★ My Online Tutorials ► https://www.dptutorials.com
LEARNING RESOURCES I Recommend: https://www.dptutorials.com/resources
Subscribe for more Awesome Tutorials: http://goo.gl/NyAtg2
Support the Channel via shopping: http://ift.tt/2jH38PR
Tools that I use for Vlogging:
• Laptop: http://fkrt.it/AM9ab_uuuN
• Canon 200D Camera: http://fkrt.it/AMz75_uuuN
• Benro Tripod: http://fkrt.it/An1lm_uuuN
• Microphone: http://fkrt.it/A2RHz_uuuN
• Collar Microphone: http://fkrt.it/yL8kdQNNNN
• Screen recorder: https://techsmith.pxf.io/2BMjA
• Boom Arm Stand: http://fkrt.it/ypUD8QNNNN
• Zoom H1 Audio Recorder: http://fkrt.it/ypb7WQNNNN
• Harison Softbox Studio Lights: http://fkrt.it/ypCaRQNNNN
• Chroma Key Green Screen: http://fkrt.it/A3gnb_uuuN
• Background Support Stand: http://fkrt.it/A3cCb_uuuN
• Acoustic Foam Background: http://fkrt.it/ypsGdQNNNN
• USB RGB LED Strip: http://fkrt.it/A3T_5_uuuN
• Wireless Mouse: http://fkrt.it/A3Bqz_uuuN
Note: This description contains affiliate links, which means at no additional cost to you, we will receive a small commission if you make a purchase using the links. This helps support the channel and allows us to continue to make videos like this. Thank you for your support!
***********************************************
You Can Connect with Me at:
YouTube: / dptutorials
G+: http://ift.tt/2kAOpa6
Twitter: / dptutorials15
Facebook: http://ift.tt/2kfRnDi
BlogSpot: http://ift.tt/2kB14dh
Follow:
www.dptutorials.com
www.askplanner.blogspot.com
Tags: -
P6:
primavera p6 training online, primavera p6, primavera p6 training, primavera p6 tutorial, oracle primavera, primavera p6 download, primavera 6, oracle primavera p6, primavera p6 free download, primavera project management, primavera project planner, primavera download, primavera online, primavera training, primavera software free download, youtube primavera, primavera tutorial, is primavera online easy, p6 online, primavera p6 complete video tutorial free down

Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: