Opening of the spillway gates at Robert-Bourassa generating station
Автор: Hydro - Québec
Загружено: 2018-10-30
Просмотров: 113401
From October 11 to 14, 2018, a rare event took place at the Robert-Bourassa facility: the eight spillway gates were opened, one after the other, letting the water flow through at full capacity. These tests are part of Hydro-Québec’s dam safety program. Testing is performed every year, but the spillway gates are usually opened only to about 10%. This was the first time since 1987 that such a large flow was let through the gates.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: