BNSF Railway switch cutover @ Tagus, ND
Автор: Andrew Rostad
Загружено: 2013-07-22
Просмотров: 16663
This is a time-lapse I shot while at work of a main line power switch install on the east end of Tagus, ND (ESS Tagus) on September 18, 2012. I used a GoPro 2 w/ an external battery pack that I perched on top of a signal pointing west. The GoPro was set to take a picture every 5 seconds and I ended up with a total of 4,146 images so this video covers 5 hours and 45 minutes of time that I condensed down into a 2 minute and 18 second video.
Enjoy!
P.S. Stay away from railroad tracks!!
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: