Intelligent Faftory!
Автор: Máy gỗ Nanxing Vietnam
Загружено: 2025-11-20
Просмотров: 26
This case demonstrates a streamlined and highly efficient operational model through multiple processes including edge banding, drilling, and sorting, achieving a stable output target of 3,800pcs/shift. Overall labor costs are reduced by 50%, production efficiency is increased by 45%, and the delivery cycle is consistently kept within 10 days.
✅️Labor cost optimization
Reducing labor costs by 50%. This achieves the production goal of "less manpower and higher efficiency."
✅️Production efficiency
Production efficiency increased by 40%, and overall plant capacity increased by 30%. The production line achieved 24-hour continuous operation, capacity over 3,800pcs/shift
✅️Delivery time
Production cycle was shortened by 40%, and delivery cycle was significantly reduced to 10 days, improving customer satisfaction.
✅️Quality Improvement
By use laser edge banding, it achieves a perfect result of "zero glue residue and zero peeling." Automated production ensures that the process precision meets industrial-grade standards, increasing the product qualification rate to 99.8%.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: