The Dredging of a lake and processing of the silt removed.
Автор: Peter Smith
Загружено: 2020-09-07
Просмотров: 17856
This was a project undertaken by CSG to remove 68,000 m3 of silt from a recreational lake. The silt was dewatered to cake at 25% dry matter and over 7,000 tonnes of cake was taken off site.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: