Why 1950s Tower Cranes Lifted Loads for 60 Years While Modern Cranes Need Replacement at 25
Автор: Industrial Age Archives
Загружено: 2025-11-30
Просмотров: 1188
Why 1950s Tower Cranes Lifted Loads for 60 Years While Modern Cranes Need Replacement at 25
Liebherr and Potain tower cranes manufactured in the 1950s are still operating on construction sites across Europe, having lifted loads continuously for six decades with proper maintenance. Modern tower cranes have an expected service life of 20-25 years before structural fatigue, hydraulic system degradation, and outdated control systems make replacement more economical than repair. The 1950s cranes used thicker steel sections in the mast, simple clutch-and-brake hoisting mechanisms, and over-engineered structural connections designed with safety factors of 5:1 or higher. They featured grease-packed slewing rings that could be serviced indefinitely and electric motors with brushes that could be replaced rather than entire sealed motor units. Modern cranes optimize material usage through computer analysis, resulting in lighter structures that meet safety codes but lack the longevity of those massively over-built 1950s designs.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: