Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
dTub
Скачать

Assembly threaded joint (FPI) full pipe lenght during DNV Exam Dammam

Автор: Jan Steen

Загружено: 2013-03-22

Просмотров: 11504

Описание:

Makeup of 8" yellow box FPI pipe joint as part of DNV practical exam, ISO 14692 (2017) & ISO 3650 & ISO 17024
When we did the first exam for Aramco, the request was from Vicenzo (CSD Aramco) that we do not only the "silly" assembly of small pieces (about 1 meter long and 4" diameter) and then install a complete line. Vicenzo was requesting a makeup of a joint of a full-length pipe.

A full-length pipe you can not handle with some handpower alone you need a crane or similar/ A forklift truck in this movie with moving also in the axial direction which made in this case assembly more easy. A full-length pipe weighs over 200 kg. When not handled with care you will destroy the threads, alignment is very important as you can have cross-thread in that case it is over. The bottom line it is a completely different discipline.

We, Vicenzo (Aramco) + Alwin Fahrer FPI, and I, decided that we will use two lengths of pipe and make it up to hand tight we do not use a so-called dope=TF15 otherwise you can not untwist the pipe after full makeup. So to handtight and no dope which makes the samples multi-reusable. We have made with these pipes over 100 !! make-ups. With dope, we would have lost 100 pipes (which is of course not economical).

During the exam we have a group of around 5 to 6 people of which one is appointed "boss" he has to give all instructions for the make-up of the joint and take care of the alignment. The joint is then made up of the last 5 threads. Untwist and then next candidate. So everybody is one one-time boss. Sometimes the candidate has to redo the whole makeup again.

Further, I set the pipe under quite a slope, otherwise, the alignment is to easy, flat floor everything fits but does not match with reality.

Experienced candidates with work and no experience with this GRP material, really like it: "It is like working in a trench".
www.grpcenter.com, [email protected]

See this link for the DNV examination scheme. https://www.dnv.nl/services/grp-pipe-...
This video gives an impression of how an examination is performed according to the DNV examination scheme for bonders, jointers, spoolbuilders, or pipefitters. Assembly of the joints is checked against the manufacturer's procedures during the exam. This has to be done correctly. The joint will be tested at 2,5 times the design pressure for 1 hour no leaks allowed in the joint.
GRP Pipe systems specialists
The quality and thus reliability of GRP (Glass-fibre Reinforced Plastic ) pipe systems are based on their design, production, assembly, and maintenance. Therefore, end users, manufacturers, contractors, consultancies, and other organizations need to ensure the relevant competencies of personnel during all stages, especially related to connecting all pipes and other parts into one big GRP pipe system.

DNV has, in close cooperation with renowned stakeholders, set competence profiles for professionals working on GRP pipe systems. The certification of the professional competence requirements follows ISO 14692 (2017) & ISO 3650 & ISO 17024, as determined by the DNV Committee and incorporated in the end terms. The DNV Certification Committee for GRP accommodates the major global end users, manufacturers, contractors, and consultants for GRP pipes in developing and maintaining globally acceptable personnel competence standards and pragmatic but strict certification rules for the currently established competence profiles for field specialists in GRP pipe systems

ISO/IEC 17024-2004
Conformity Assessment - General Requirements For Bodies Operating Certification Of Persons
Specifies requirements for a body certifying persons against specific requirements, including the development and maintenance of a certification scheme for persons. Identical with and reproduced from ISO/IEC 17024:2003


https://www.dnv.nl/services/grp-pipe-...

Bonder
A Bonder is a skilled worker, specialized in jointing GRP pipes, whose competencies are certified and related to one or more different types of joints (e.g. laminated joints, adhesive joints, threaded joints, “O”--rings, locking keys, etc.)

Spool builder
A spool builder is a certified bonder and additionally certified for assembling the GRP spools and fabricating GRP (mitered) Tee’s and mitered Elbows.

Pipe fitter
A Pipe fitter is certified to lay out, assemble, fabricate, maintain, and repair piping systems.

Supervisor
A certified supervisor monitors and takes responsibility for the execution of the work done by the bonders, spool builders, and pipe fitters.

Inspector
The certified inspector independently monitors the installation of the GRP piping systems. He controls and verifies that bonders, spool builders, pipe fitters, supervisors, and other personnel have performed in compliance with the job specs.

Assembly threaded joint (FPI) full pipe lenght during DNV Exam Dammam

Поделиться в:

Доступные форматы для скачивания:

Скачать видео mp4

  • Информация по загрузке:

Скачать аудио mp3

Похожие видео

Examination acc. DNV Examination scheme spoolbuilder OPS Norway, www.grpcenter.com

Examination acc. DNV Examination scheme spoolbuilder OPS Norway, www.grpcenter.com

Fiberdur laminated joint electric conductive 2022

Fiberdur laminated joint electric conductive 2022

Assembly adhesive bonded joint DN200 PN40 FPI TB/TS

Assembly adhesive bonded joint DN200 PN40 FPI TB/TS

Superlit Pipe Industries Corporate Movie

Superlit Pipe Industries Corporate Movie

assembly laminated joint DN 200  PN 40 may 2016

assembly laminated joint DN 200 PN 40 may 2016

Гениальные строители другого уровня 🏗️🔥

Гениальные строители другого уровня 🏗️🔥

GRE/RTR lamination work at ARAMCO project, AMIANTIT/ISECC mobile Team.

GRE/RTR lamination work at ARAMCO project, AMIANTIT/ISECC mobile Team.

Examination acc DNV certification scheme Damman SA, FPI, www.grpcenter.com

Examination acc DNV certification scheme Damman SA, FPI, www.grpcenter.com

DOCUMENTARY OF INSTALLATION FOR  RTRP POTABLE & FIRE WATER LINE 1200  MM DIA

DOCUMENTARY OF INSTALLATION FOR RTRP POTABLE & FIRE WATER LINE 1200 MM DIA

Practical part of DNV Exam laminators at Versteden The Netherlands

Practical part of DNV Exam laminators at Versteden The Netherlands

DNV examination certification assembly threaded joint FPI,  ISO14692

DNV examination certification assembly threaded joint FPI, ISO14692

GRE - BONDING OPERATION WITH  EPOXY -2021

GRE - BONDING OPERATION WITH EPOXY -2021

GRE Pipe Lamination Butt-Joint Tutorial

GRE Pipe Lamination Butt-Joint Tutorial

GRE - LAMINATION OPERATION -2021

GRE - LAMINATION OPERATION -2021

Хранение и транспортировка RTR | Трубопровод высокого давления RTR

Хранение и транспортировка RTR | Трубопровод высокого давления RTR

BEDC Coupling installaation.

BEDC Coupling installaation.

Мало кто знает об этой функции ТОРМОЗНОГО ДИСКА !!!

Мало кто знает об этой функции ТОРМОЗНОГО ДИСКА !!!

Почему средневековое железо никогда не ржавело, а ваше умирает через 2 года

Почему средневековое железо никогда не ржавело, а ваше умирает через 2 года

How to use a Fiberglass Pipe Shaver to Join GRE Pipes in 2 steps - Taper Spigot

How to use a Fiberglass Pipe Shaver to Join GRE Pipes in 2 steps - Taper Spigot

Comment installer des tubes PRV (Francais)

Comment installer des tubes PRV (Francais)

© 2025 dtub. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: [email protected]