Clixby Anaerobic Digestion Plant
Автор: CLSConstruction
Загружено: 2015-06-01
Просмотров: 6499
CLS were engaged by Qila Energy to undertake the civil engineering and construction works on a 0.5MW Anaerobic Digestion Plant at Clixby, Caistor.
Design & Construction works included:
• 68m x 60m hot rolled asphalt feedstock clamp
• 332m x 3.5m high precast concrete clamp walls
• Ancillary structure foundations
• Drainage and ducting works site wide
• 1600m2 of concrete hardstanding
• 32m diameter final storage tank
• 22m diameter digester tank
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: