High School Stage Production Backdrop Builds
Автор: Wichita Public Schools
Загружено: 2021-11-19
Просмотров: 7593
Over a period of several weeks, students from 8 high schools in USD 259 came to the former Southeast High School Building to create new stage production backdrops. The project was made possible through a grant from the Education EDGE. The project was led by Rachel Downs, owner/operator of PAINTology, a local business that provides custom painting on almost any surface.
To learn more about the Education EDGE program, visit https://www.usd259.org/edge.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: