Cold Water Systems Learner Outcome 1.6 Phase 1
Автор: MGL Plumbing Training
Загружено: 2023-05-21
Просмотров: 1146
Cold Water Systems Learner Outcome 1.6 Phase 1;
Service to the property:
• Connection methods to the main
• Communication pipe detail
• Service pipe detail
• Main external stop valve location and meter housings
• Installation requirements
• Methods of entry of the service pipework to a property
This unit covers the installation, maintenance, decommissioning and soundness testing of a range of cold water system/component types in domestic dwellings/light commercial properties. The scope
of the system is from the boundary stop valve into the property feeding the water outlets.
GPS PE Pipe Systems Video link
• How to install Protecta-Line 25mm & 32mm S...
Remember, if you for this video useful, drop a 'LIKE', leave a 'COMMENT', even hit that 'SUBSCRIBE' button and help support the channel.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: