Link-Belts Complete Heavy Picks, Work $1.3B GDOT Project
Автор: Link-Belt Cranes
Загружено: 2026-01-21
Просмотров: 375
Link-Belt crawler cranes are vital to a massive infrastructure renovation issued by the Georgia Department of Transportation (GDOT). Utilizing a 200-ton 248 HSL and a 150-ton 238 HSL, C.W. Matthews of Marietta, Georgia, is the lead construction contractor on the $1.3 billion project.
“These Link-Belt cranes are made dependable,” C.W. Matthews operator Ronald Carter said. “They can do just about anything you want in terms of lifting materials of all kinds.”
•
•
Follow Link-Belt Cranes:
Website: https://www.linkbelt.com/
LinkedIn: / linkbeltcranes
Instagram: / linkbeltcranes
X: https://x.com/LinkBeltCranes
YouTube: / @linkbeltcranes
Threads: https://www.threads.net/@linkbeltcranes
#linkbelt #crane #americanbuilt #crawlercrane #construction
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: