PALFINGER Railway / Eisenbahn - PA 1002
Автор: PALFINGER AG
Загружено: 2016-08-01
Просмотров: 6306
Maintenance of overhead contact wires with PA1002.
Optimum efficiency is achieved when PALFINGER railway units are used in combination with each other. This means, for example, that all work positions can be reached simply, quickly and safely when installing and maintaining overhead contact wires. By simultaneously using a positioner which is remotely controlled from the platform, the pressure on the anchor points of the contact wire and carrying cable can be relieved and work can be carried out on insulators and mounting brackets. If another crane is used in addition, then even the heaviest components such as the overhead contact wire masts or automatic tensioners can be replaced in record time. System solutions include a number of optionally matched units.
_
Allerhöchste Effizienz wird erreicht, wenn PALFINGER Eisenbahngeräte miteinander kombiniert zum Einsatz kommen. So sind z.B. im Fahrleitungsbau und in der Fahrleitungserhaltung mit einer Hubarbeitsbühne alle Arbeitspositionen einfach, schnell und sicher zu erreichen. Mit einem gleichzeitig eingesetzten und von der Bühne aus ferngesteuerten Positionierer können Abspannpunkte von Fahrdraht und Tragseil entlastet und Isolatoren und Ausleger bearbeitet werden. Kommt zusätzlich noch ein Kran zum Einsatz, dann können sogar schwerste Komponenten wie Fahrleitungsmaste oder Radspannwerke in Rekordzeit ausgetauscht werden. Systemlösungen sind mehrere optional aufeinander abgestimmte Geräte.
More Info:
https://www.palfinger.com
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: