Gavins Point powerhouse annual maintenance in full swing
Автор: USACE Omaha District
Загружено: 2025-01-22
Просмотров: 114
Every year, the hydroelectric power generators at the Gavins Point Dam powerhouse, operated by the U.S. Army Corps of Engineers, Omaha District, are brought down one at a time to undergo annual maintenance. The maintenance begins in the fall when water releases are lower and concludes in early spring.
These comprehensive mechanical and electrical inspections ensure the units are operating safely and at peak performance. This video highlights maintenance being done on the Unit #3 hydropower generator.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: