Boiled linseed oil entire platform
Автор: Desert Bounty
Загружено: 2026-01-06
Просмотров: 19
Preserving non pressure treated pine, no ground contact except the rim joist ( outside perimeter)
I positioned and leveled this joint set up on the 4 corners upon stones. I also set stones under the middle areas and nailed and screwed legs to the frame then rested the feet or contact ends upon stones also leaving a cavity.We will add stones around the base and then grade the perimeter, then create a stone check dam to divert rain water sheet flow away from the foundation stones.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: