Karot Hydropower Project|CPEC|China Three Gorges|CTG|Commercially Operational
Автор: Hydropower Updates
Загружено: 2022-07-07
Просмотров: 62
Karot Hydropower Project is located on the Jhelum River which is the 4th among the 5 Cascade HPPs to be developed along Jhelum River. Installed capacity of the Project is 720MW (4×180MW) with average annual electricity output 3206 GW•h and annual utilization hours 4452h. As a single power generation task hydropower complex, The project’s structure layout includes rock fill dam, spillway, powerhouse, diversion tunnels, head race power tunnels, tail race tunnel and etc. The project is being developed under the Power Policy 2002 on a Build-Own-Operate-Transfer (BOOT) basis with 5 years construction period and 30 years concession period. 720MW Karot Hydropower Project has been listed as one of the Prioritized Project under the China-Pakistan Economic Corridor (CPEC).