Pate de Verre ~ glass pack
Автор: Geoffrey Bowton
Загружено: 2022-08-06
Просмотров: 1149
This time laps video exposes methods I use to install glass frit layers inside a refractory mold. The original video was 16 minutes in real time, just working the outside lower right boot section. After installing all the "sides" of the glass walls, I pass through in search of blending and packing the frit firmly together, where all "sides" meet ~ to ensure no separation of the glass in the firing, and no potential cracking when handling the work.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: