"A mystery that makes sense" | SpaceX Starbase
Автор: NASASpaceflight
Загружено: 2025-11-09
Просмотров: 81565
A huge SpaceX-themed test device was rolled down Highway 4, called "ibeproofin'", related to Starbase Pad 2 readiness, while future ships that will launch from the new pad continue build-up in Starfactory.
⚡ Become a member of NASASpaceflight's channel for exclusive Discord access, fast turnaround clips, and other exclusive benefits. Your support helps us continue our 24/7 coverage. Click JOIN above to get started.⚡
🎥 Video from Ceaser G, Gage, and Starbase Live.
✂️ Edited by Thomas Hayden (@_thomashayden).
🔍 If you are interested in using footage from this video, please review our content use policy: https://www.nasaspaceflight.com/conte...
L2 Boca Chica (more clips and photos) from BC's very early days to today.
🔗 https://forum.nasaspaceflight.com/ind...
(Join L2 and support NSF here: https://www.nasaspaceflight.com/l2/)
#SpaceX #StarbaseUpdate #SpaceNews #SpaceExploration #RocketLaunch #Starship #BoosterTesting #SpaceTechnology #SpaceXUpdates #SpaceXLaunch #SpaceXStarbase #SpaceXNews #SpaceXUpdates2025 #StarbaseLaunchSite #StarshipModifications #SpaceXLaunchPad #SpaceXTesting #SpaceXProductionSite #SpaceXBoosterTesting #SpaceXLaunchUpdates #SpaceXSpacecraft #spacexdevelopment
Timestamps:
0:00 Booster QD Disassembled
0:31 Cables Run Down Tower 1
0:48 More Cables Behind the Tower
1:01 Pile Drilling for the ASU
1:24 Ship 43’s Common Dome Section
1:33 Ship Transfer Tubes Moved to MB2
1:58 Fourth Tower Crane Boom Installed
2:08 ibeproofin’ Tool
2:56 Pad 2 Booster QD Retract Tests
3:11 Ship 40’s Nosecone Moved
3:51 Office Building
4:06 Raptor Display
4:15 Apartment Building Construction
4:31 Pad 2 LOX Pump Testing
5:16 Flag on Tower 1
5:32 Pad 1 Upgrade Preps Continue
5:46 Masseys Test Site
5:55 Ship Static Fire Stand
6:03 B18.1 and B18.3 Test Tanks
6:11 Scaffolding at B18.3
6:19 Work at the Ship Cryo Station
6:27 “Test Tank 18” Aft Section Lifted
6:38 “Test Tank 18” Moved Into MB2
6:47 Pad 1 Booster QD Removed
7:02 More Cybertrucks Delivered
7:18 Giga Bay Construction
8:11 Tower Crane Operations
8:37 Crane Parts Delivered
9:33 ibeproofin’ Lifted Into Pad 2
10:07 Pad 1 Drawworks Leaving Starbase
10:50 Very Quick Pad 2 Deluge Test
11:02 Longer Pad 2 Deluge Test
11:23 Tile Pull Testing
12:07 “Test Tank 18” Moved
12:22 OLM Section Removed