2420 N Schofield
Автор: Doug Banry
Загружено: 2025-12-22
Просмотров: 15
Lateral sewer line inspection. Entered the clean out to the right of the driveway next to the walkway. ABS pipe for 30.5' to where it joined a portion of the ABS pipe that has been rehabilitated with a cured in place epoxy liner. The expoxy liner continued to 41.5' where it joined the green city stub out. Continued to scope to 58.4 feet where the stub out joined the city sewer line. No defect were noted, other than the repaired area. The epoxy liner was smooth and appeared intact
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: