Crafting & Unveiling a Cable-Stayed Bridge Model | BE Civil 8th Semester (Batch 2020) | OCEM
Автор: Oxford College Gaindakot
Загружено: 2025-06-12
Просмотров: 202
Presenting the journey of innovation, teamwork, and engineering excellence!
This video showcases the construction and unveiling of a cable-stayed bridge model, meticulously designed and built by the talented students of BE Civil 8th Semester (Batch 2020) at Oxford College of Engineering and Management.
🛠️ Part 1: Watch as the students bring their vision to life — building the cable-stayed bridge model from scratch with precise structural detailing and hands-on skills.
🎉 Part 2: Witness the proud moment during the curtain-raising ceremony held on Jestha 25, 2082 BS, as the completed model is handed over to our respected Principal, Prof. Dr. Er. Hari Bhandari.
👷♂️👷♀️ Team Members:
1. Rabin Rana
2. Rajan Bhatta Chhetri
3. Rajesh Kumar Shrestha
4. Sandesh Ghimire
5. Sangita Shrestha
6. Saphal Tiwari
A proud milestone for our Civil Engineering Department, this project is a shining example of academic brilliance and practical application.
🔔 Don’t forget to like, share, and subscribe for more student innovations and campus highlights!
_
_
_
Disclaimer:
This video is a part of an academic project created by students of BE Civil 8th Semester (Batch 2020) at Oxford College of Engineering and Management. All visuals, models, and content showcased are for educational and demonstration purposes only.
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: