Energy Arbitrage | Episode 4 of 8 - Rosebank Mall – COMAP SMART GRID AUTOMATION
Автор: ENERGY SYSTEM DESIGN with Wally
Загружено: 2025-09-09
Просмотров: 8126
VIDEO 4 OF 8 – COMAP SMART GRID AUTOMATION
This is the fourth episode in our Rosebank Mall Energy Project Documentary Series.
Here, we focus on the intelligence of the system — ComAp’s advanced controllers that orchestrate batteries, generators, and the grid into one seamless smart energy network.
EPISODE OVERVIEW
Reliable energy management in a hybrid system requires precision control. At Rosebank Mall, ComAp controllers act as the “brains” of the project — enabling real-time optimisation of cost, carbon, and resilience.
Through a combination of InteliNeo 6000, InteliMains 1010, and InteliGen 1000 units, the system:
Manages seamless power flow between grid, batteries, and dual-fuel generators
Executes peak-shaving, tariff-based arbitrage, and demand response automatically
Supports fast transitions between grid-connected and islanded operation
Provides PLC-driven fault handling, redundancy, and data logging
Gives stakeholders 24/7 visibility via cloud-based WebSupervisor and InteliConfig
What You’ll See in This Episode:
How ComAp’s smart grid logic makes automated energy decisions in milliseconds
Insights into the programming and control philosophy applied at Rosebank Mall
The role of PLC logic in dynamic load management, grid-island transitions, and automatic load shedding
Dashboards and monitoring tools that give operators and engineers real-time visibility and control
VIRTUAL PLANT TOUR - MATTERPORT
Step inside the system like never before with this interactive 3D Matterport tour of the entire plantroom.
Click the link below and use your mouse to move forward, left, right, up, and down through the plantroom. You’ll see the FreedomWon batteries, EPC inverters, transformers, and full hybrid microgrid layout – exactly as it was built:
https://my.matterport.com/show/?m=Vn8...
Documentary Series – 8 Episodes
1 - Project Summary & Launch Event – Official release at the August 12th launch
2 - Freedom Won – Inside the 6 MWh Battery System at Rosebank Mall
3 - ComAp Dual-Fuel Generator Upgrade – Power flexibility and reduced diesel dependency
4 - ComAp Smart Grid Automation – The intelligence behind the system
5 - Energenic Main Contractor – Building the electrical backbone
6 - 3D Engineering & System Design – Design Behind the Scenes
7 - Engineering Challenges & Smart Grid Implementation
8 - The Launch Event – The ribbon cutting and reveal
Subscribe now so you’ll be notified when each new episode is released.
Partners Featured in This Episode:
ComAp | Energenic | Freedom Won | Egoli Gas | UT Energy | Hyprop Investments I BuroTech
Media Coverage & Articles:
Engineering News – https://www.engineeringnews.co.za/art...
AFSIA – / afsia_africasolar-solar-solarpower-activit...
TechCentral – https://techcentral.co.za/rosebank-ma...
#RosebankMallEnergyProject #ComAp #SmartGrid #HybridEnergy #EnergyResilience #Microgrid #Automation #PLC #InteliNeo6000 #InteliMains1010 #InteliGen1000
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: