Energy Arbitrage | Episode 5 of 8 - Rosebank Mall – THE ELECTRICAL BACKBONE OF ENERGY ARBITRAGE
Автор: ENERGY SYSTEM DESIGN with Wally
Загружено: 2025-09-16
Просмотров: 5865
VIDEO 5 OF 8 – ENERGENIC: THE ELECTRICAL BACKBONE OF ENERGY ARBITRAGE
This is the fifth episode in our Rosebank Mall Energy Project Documentary Series.
In this chapter, we shift focus to the engineering contractor behind the entire system — Energenic — the team that built the electrical backbone enabling Africa’s most advanced hybrid microgrid.
EPISODE OVERVIEW:
For a smart grid to function, it needs more than just batteries and generators — it needs world-class infrastructure at high voltage. At Rosebank Mall, Energenic designed and delivered the 11kV electrical backbone that allows seamless integration between grid power, dual-fuel generators, and the 6 MWh battery system.
Through precision engineering, Energenic implemented:
Transformers of 5 MVA, 2.5 MVA, and 1 MVA stepping power up to 11 kV
EPC inverters converting DC from batteries to grid-ready AC
Switchgear and protection systems for safety and resilience
A new NEC NER earthing system reducing fault levels by 90%
Fibre optic communication links enabling lightning-fast smart grid response
What You’ll See in This Episode:
How Energenic blended new infrastructure with existing systems — without ever switching the lights off
Insights from Energenic’s engineers on switchgear design, SCADA integration, and system interconnection
High-voltage cable installations, earth mats, and fibre optic comms creating a true microgrid topology
How PLC programming and ComAp integration enable real-time control, prioritisation, and energy cost optimisation
VIRTUAL PLANT TOUR - MATTERPORT
Step inside the system like never before with this interactive 3D Matterport tour of the entire plantroom.
Click the link below and use your mouse to move forward, left, right, up, and down through the plantroom. You’ll see the FreedomWon batteries, EPC inverters, transformers, and full hybrid microgrid layout – exactly as it was built:
https://my.matterport.com/show/?m=Vn8...
Documentary Series – 8 Episodes
1 - Project Summary & Launch Event – Official release at the August 12th launch
2 - FreedomWon – Inside the 6 MWh Battery System at Rosebank Mall
3 - ComAp Dual-Fuel Generator Upgrade – Power flexibility and reduced diesel dependency
4 - ComAp Smart Grid Automation – The intelligence behind the system
5 - Energenic Main Contractor – Building the electrical backbone
6 - 3D Engineering & System Design – Design Behind the Scenes
7 - Engineering Challenges & Smart Grid Implementation
8 - The Launch Event – The ribbon cutting and reveal
Subscribe now so you’ll be notified when each new episode is released.
Partners Featured in This Episode:
Energenic | ComAp | Freedom Won | Egoli Gas | UT Energy | Hyprop Investments | BuroTech
Media Coverage & Articles:
Engineering News – https://www.engineeringnews.co.za/art...
AFSIA – / afsia_africasolar-solar-solarpower-activit...
TechCentral – https://techcentral.co.za/rosebank-ma...
#RosebankMallEnergyProject #Energenic #ElectricalEngineering #SmartGrid #EnergyResilience #HybridEnergy #Microgrid #PowerSystems #EnergyIndependence
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: