Популярное

Музыка Кино и Анимация Автомобили Животные Спорт Путешествия Игры Юмор

Интересные видео

2025 Сериалы Трейлеры Новости Как сделать Видеоуроки Diy своими руками

Топ запросов

смотреть а4 schoolboy runaway турецкий сериал смотреть мультфильмы эдисон
dTub
Скачать

RED DEVIL - Restoration - First Steam Test

Автор: Wayne Nauschutz

Загружено: 2018-06-30

Просмотров: 9605

Описание:

Audio has been overwritten at the end of the video. This was done to avoid any copyright infringements.

In this instalment, the crew pack the firebox and light up the locomotive for the first time in nearly fifteen years. The steam test lasted two days during which the various systems and devices were tested and adjusted. Western Cape, South Africa.

Músic by e-soundtrax: http://bit.ly/2CCbCAB

South African Class 26, No 3450 affectionately known as the Red Devil originally started life as a standard class 25 Non-condenser built by Henschel in 1953, works number 28769.

The class initially suffered a number of teething problems with their connecting rod bearings and valve gear. This lead to a redesign of the cross-heads and the fitment of larger bearings from other manufacturers.

The NCs soon went on to prove themselves as some of South Africa's most capable and reliable mainline steam locomotives with many seeing service well into the early 1990's. They still considered one of the largest non-articulated narrow gauge steam locomotives ever built.

Political motivations, strategic locomotive reserve or the looming oil crisis are a discussion for another time and place. I believe it worth mentioning that the Red Devil existence can almost exclusively be attributed to David Wardale, Livio Porta and the many workshop and footplate personnel that took interest in the project and not necessarily the SAR.

Wardale's work was met with a fair amount of resistance from the SAR hierarchy with many believing the project to be a waste of time and money on traction that they already considered obsolete. Many also believed that steam had reached its full potential and weren't keen to accept that their own work could be improved upon. If it wasn't for Wardales's rather ask for forgiveness than permission approach the project most likely would have seen untimely demise.

With that being said the Red Devil wasn't perfect, prototypes seldom are, but it proved the principles were sound and the hope was that it would lead to the development of entirely new class designed from the ground up deploying those principles.

Despite the time and effort invested in its creation, the Red Devil was simply too complicated and soon fell out of favour with maintenance and footplate crews. Many of which simply refused to learn how to operate it correctly and this quickly lead to a false perception that the locomotive was a poor performer and no better than a standard 25NC.

With Wardale leaving the SAR and nobody to look after it, crews took upon themselves to remove many of the modification some of which were specially manufactured. There are however a number of structural modification that could not be removed and these are still visible on the locomotive today.

Wardale's book is a must-read for any serious enthusiast, if not for the story, read it for the truth. The improvements done during its conversion ultimately lead to 28% coal saving, 30% water saving and a 43% increase in drawbar power. During its peak, the Red Devil had a maximum power output of 5030 hp at 100km/h.

3450 has been in storage for nearly two decades but has now been leased by Ceres Rail Company that have moved the locomotive to Worcester for restoration. Western Cape, South Africa.

List of improvements.

Lempor exhaust.
Addition of ten super heater flues and elements.
Larger super heater header salvage from GMA.
Feed water heater.
Lengthened smokebox.
Improved cylinder and valve lining lubrication system.
Piston valves.
Articulated valve spindles.
Valve liner cooling system.
Streamlined steam ports.
Herdner starting valves.
Altered Walschaerts valve gear.
Enlarged steam chests.
Improvement steam pipes
Improved pistons
Improved piston and valve rod packings.
Improved insulation.
Variable stroke lubricator drive.

Further Reading: Red Devil -https://en.wikipedia.org/wiki/South_A...
Ceres Rail Company - http://www.ceresrail.co.za/

RED DEVIL - Restoration - First Steam Test

Поделиться в:

Доступные форматы для скачивания:

Скачать видео mp4

  • Информация по загрузке:

Скачать аудио mp3

Похожие видео

RED DEVIL - Restoration - Final Steam Test and Transfer

RED DEVIL - Restoration - Final Steam Test and Transfer

RED DEVIL - Transfer to Worcester - Restoration

RED DEVIL - Transfer to Worcester - Restoration

Dampfmaschinen Fest Eystrup 2025 (Sonntag) #steamengine

Dampfmaschinen Fest Eystrup 2025 (Sonntag) #steamengine

Переговоры провалились / Срочная переброска войск

Переговоры провалились / Срочная переброска войск

Baldwin 26 Move: From Shop to Roundhouse at Steamtown

Baldwin 26 Move: From Shop to Roundhouse at Steamtown

Как сделать парогенератор из газового баллона

Как сделать парогенератор из газового баллона

ДОМ НА ГУСЕНИЦАХ: как СССР покорял Антарктиду на вездеходах Харьковчанка-2

ДОМ НА ГУСЕНИЦАХ: как СССР покорял Антарктиду на вездеходах Харьковчанка-2

Analyzing Steam Locomotive Drafting Systems - Part II

Analyzing Steam Locomotive Drafting Systems - Part II

Однопоточные гидромеханические передачи, 1974

Однопоточные гидромеханические передачи, 1974

Потери России и Украины в период СВО. Разбор и анализ.

Потери России и Украины в период СВО. Разбор и анализ.

South African Steam 19D Daizy 3334, Red Devil, 16D Big Bertha 860 #locomotive #train Derick Stander

South African Steam 19D Daizy 3334, Red Devil, 16D Big Bertha 860 #locomotive #train Derick Stander

12 машин, работающих без перерыва больше 100 лет

12 машин, работающих без перерыва больше 100 лет

Red Devil - Inaugural Run - Part Three - Failed Locomotive

Red Devil - Inaugural Run - Part Three - Failed Locomotive

Steam School: Boiler Feeding Ohio Injector Company Garfield Dual Jet Injector

Steam School: Boiler Feeding Ohio Injector Company Garfield Dual Jet Injector

Генератор постоянного тока, 1969

Генератор постоянного тока, 1969

25NC 3437 Worth the Wait!

25NC 3437 Worth the Wait!

ПОЧЕМУ МИРА НЕ БУДЕТ? ИТОГИ ПЕРЕГОВОРОВ С США. ФРАНЦИЯ ЗАХВАТИЛА ТАНКЕР РФ. Дмитрий Никотин

ПОЧЕМУ МИРА НЕ БУДЕТ? ИТОГИ ПЕРЕГОВОРОВ С США. ФРАНЦИЯ ЗАХВАТИЛА ТАНКЕР РФ. Дмитрий Никотин

Смазка двигателя, раздел 2, 1972

Смазка двигателя, раздел 2, 1972

Идеальное оружие: смогут ли гафниевые бомбы заменить ядерные?

Идеальное оружие: смогут ли гафниевые бомбы заменить ядерные?

Грузовой поезд (1954)

Грузовой поезд (1954)

© 2025 dtub. Все права защищены.



  • Контакты
  • О нас
  • Политика конфиденциальности



Контакты для правообладателей: infodtube@gmail.com