Carshade workshop kasheli | Thane - Bhiwandi - Kalyan Metro Line 5 contruction
Автор: Droneman kalpesh jadhav
Загружено: 2025-02-08
Просмотров: 5085
#Dronemankalpeshjadhav
#Droneman_kalpesh_jadhav
Carshade workshop kasheli | Thane - Bhiwandi - Kalyan Metro Line 5 contruction
नमस्कार मित्रांनो.....
🙏🙏🙏🙏🙏🙏
आजच्या व्हिडीओ मध्ये आपण Thane Bhiwandi Kalyan Metro Line पाहणार आहोत. चला तर मग Thane Bhiwandi Kalyan Metro Line पाहूयात ड्रोनच्या नजरेतून ...................
I hope you like this video and if you do then do not forget to hit like button and comment. If you are new to the channel then please subscribe and press the bell icon also so that you can get the notifications of my videos.
Turn on the music and view Full Screen. (Watch till end)
Enjoy !
-----------------------------------------------------------------
IMFORMATION-
Line 5 (Orange Line) of the Mumbai Metro is a rapid transit metro line in the city of Mumbai, Maharashtra, India. When completed, the 24.9 km (15.5 mi) line will connect Thane with Kalyan via Bhiwandi, with 17 stations. The line will be fully elevated except for a 3 km underground section in Bhiwandi.
The line is being built in two phases. The first phase, from Thane to Bhiwandi, is currently under construction. The second phase, from Bhiwandi to Kalyan, is in the planning stage. Line 5 is expected to open in 2025.
A proposed 20.75 km extension of Line 5, from Kalyan to Taloja, is part of Orange Line 12.
Planning
In March 2016, the Mumbai Railway Vikas Corporation proposed building an elevated suburban rail corridor from Kurla to Bhiwandi via Thane at an estimated cost of ₹7,500 crore (US$870 million).[1] On 19 October 2016, the Mumbai Metropolitan Region Development Authority (MMRDA), headed by Chief Minister Devendra Fadnavis, approved a plan to build 24 km metro rail line from Thane to Kalyan via Bhiwandi. The line would have 17 stations and was estimated to cost ₹8,416 crore (US$970 million). A future extension to Taloja was also proposed.[2] The project was approved by the Maharashtra Cabinet on 24 October 2017.[3] The detailed project report for Line 5 was prepared by a consortium of D’Appolonia and Tata Consultancy Services (TCS).[4]
The project received Coastal Regulation Zone (CRZ) clearance from the Maharashtra Coastal Zone Management Authority (MCZMA) in June 2017. A 3.9 km stretch of Line 5 passes through CRZ areas along the Kasheli bridge crossing the Ulhas river, and also near Durgadi Fort.[5] The MMRDA utilized a drone to carry out survey work for Line 5. The drones were fitted with 360 degrees camera that provide up to 3 millimetres (0.12 in) accuracy. The aerial survey takes less time than a regular survey, achieves greater accuracy and helps protect against false claims for compensation.[6]
-----------------------------------------------------------------------
SPECIAL THANKS TO-
1] YouTube Audio Liabrary
२] filmora13 music
For Business Enquiry Email :- [email protected]
Disclaimer -
video is for educational purpose only.Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favor of fair use.
#travellerkalpeshjadhav
#kalpesh_jadhav
___________________________________________________________________________
Ignor Hashtags:
#newchannel
#droneshots
#dronevideo
#kalpeshjadhav
________________________________________________________________________
TOPIC COVER :-
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: