Solitude Moonbeam Express (Full Loop)
Автор: Skiliftguy Erik Sahlin
Загружено: 2025-09-04
Просмотров: 79
Moonbeam was built in 2008 by Doppelmayr CTEC replacing a fixed-grip quad of the same manufacturer that lasted only a few years from 2005-2008, then moved to indirectly replace Powderhorn in a new alignment as Powderhorn II. That quad replaced a thiokol triple chair respectively. Moonbeam serves mainly beginner and intermediate terrain as well as the Roundhouse restaurant. Moonbeam services a lot of mountain biking trails in the summer as well. This lift is relatively short for a D-CTEC lift but appropriate for its purpose. It is gonna last a very long time I know it.
SIDE NOTE: Sorry for there being so many slow-downs (10+ even) as a wedding was happening nearby the top terminal and guests had to be assisted off the chair at the bottom.
Capacity: 2,200 per hour
Ride Time: 3.5 minutes
Vertical Rise: 649 ft
Length: 2,868 ft
Towers: 11
Carriers: 64
Design Speed: 1,000 fpm
Speed day of recording: 521 fpm
Filmed August 23rd 2025
Доступные форматы для скачивания:
Скачать видео mp4
-
Информация по загрузке: